Wednesday, April 15, 2015

Check list, take one!

Things are subject to change.  Actually, things will probably change in the next few months.  I'm exhausted from working all day and then going over to the house, but I'm super grateful for the opportunity to make our house into a home.  No new posts for the next few days as I'm going to be prepping for my trip down to Portland to visit my parents/pick up my wedding dress.  Hopefully Joey will keep me updated with pictures as he works on the house this weekend!

Note: everything in bold needs to be done before we can move in!

Mudroom
ÿ        Remove fire extinguisher bolt
ÿ        Remove panel with plaques
ÿ        Get windows to open
ÿ        Replace the door trim
ÿ        Remove hooks in wall
ÿ        Repaint windowsill, window trim
ÿ        Tear up carpet, refinish wood floors
ÿ        Bench and hooks for shoes, bags
Kitchen
ÿ        Remove, paint cabinets
ÿ        Raise cabinets
ÿ        Install shelf above counter
ÿ        Paint, tile walls
ÿ        Make curtain
ÿ        Install laminate wood floor(?)
ÿ        Reupholster or remove kitchen table
ÿ        Fill hole in floor
ÿ        Fix ice maker in freezer
ÿ        Clean fridge
ÿ        Get aerator for sink
ÿ        Install recessed lights (ceiling)
ÿ        Clean!
Hall
ÿ        Remove Formica walls
ÿ        Remove metal rail
ÿ        Install new light fixtures
ÿ        Decide on paint color
ÿ        Remove carpet, refinish/replace wood floor
ÿ        Purchase carpet runner for hallway/use green runner?
ÿ        Paint hall closet/remove weird mirrors
ÿ        Repair hole in wall above closet (????)
Living room
ÿ        Texture ceiling and walls?
ÿ        Remove fake wood panels by fireplace
ÿ        Remove old light fixtures
ÿ        Repair(?) ceiling fan
ÿ        New curtains!!! (Ikea?)
ÿ        Stain (???) back of front door
ÿ        Repair lock in front door (lubricate??)
ÿ        Repair/clean fireplace
ÿ        Remove laminate, refinish/replace wood floors
ÿ        Paint trim white!!
ÿ        Add crown molding
ÿ        Replace door, adjust for swelling
ÿ        Update thermostat
ÿ        Clean
Bedroom 1 (Liz and Joey)
ÿ        Remove ceiling tile
ÿ        Remove fake beams
ÿ        Update light fixture, add ceiling fan?
ÿ        Add crown molding?
ÿ        Replace baseboard molding (painted stark white)
ÿ        Closet????????
ÿ        Sewing room????????
ÿ        Finish painting
ÿ        Refinish floors!
ÿ        Curtains (Ikea—gauzy white panels)
ÿ        Bedframe!  (Joey!!!)
ÿ        Replace trim (painted stark white)
ÿ        Clean!
Bedroom 2 (boys)
ÿ        Remove paneling
ÿ        Texture walls
ÿ        Remove metal framing
ÿ        Replace light fixture
ÿ        Curtains?
ÿ        Closet????
ÿ        Paint/stain dresser?
ÿ        Refinish wood floors
ÿ        Paint back wall dark blue, other 3 walls chalk white
ÿ        Layer wood slats over blue wall (a la Pinterest inspiration)
ÿ        Bed for Connor?
ÿ        Paint all trim stark white
ÿ        Clean!
Bedroom 3 (Heather/guest)
ÿ        Remove paneling
ÿ        Remove ceiling tiles, metal framing
ÿ        Replace light fixture
ÿ        Closet?????
ÿ        Remove carpet, laminate; refinish wood floors
ÿ        Paint all trim stark white
ÿ        Curtains
ÿ        Paint walls (choose neutral color)
ÿ        Bed??
ÿ        Bedding??
ÿ        Clean!
Bathroom
ÿ        Paint tub
ÿ        Paint toilet???
ÿ        Paint sink
ÿ        Paint cabinets
ÿ        Frame mirror
ÿ        Remove all laminate (wth.)
ÿ        Replace shower fixture
ÿ        Aerator for sink??
ÿ        Add something to the toilet tank to save on water
ÿ        Laminate flooring????
ÿ        Clean!
Basement
ÿ        Install railing on open side of stairs
ÿ        Seal nooks and crannies
ÿ        Seal walls, floors
ÿ        Upgrade water heater
ÿ        Repair dryer vent
ÿ        Repair sink
ÿ        Hook up bathroom/update!!
ÿ        Repair all cracking foundation
ÿ        Replace furnace

No comments:

Post a Comment